Technical Maintenance Center for high speed trains of Can Tunis (Barcelona)

Construction of buildings (workshops) with a storage capacity of six hish speed trains, and their driveway.

  • Location: Can tunis (Barcelona)
  • Construction company: Comsa
  • Construction year: 2007
  • Execute items:

    5500.00 m3 Various concreting works (including pumped concrete)

    10,626.21 m3 Formwork and concreting of the workshops slabs

    7000.00 m3 Formwork and concreting of the railways over piles slabs

    6,316.07 m3 Construction of rainwater collectors

    3798.84 m. Carry out of the industrial drainage

    5695.01 u. Lay out of welded anchor plates

    14384.30 u. Walls formwork