obra_34
obra_34_0
obra_34_10
obra_34_11
obra_34_3
obra_34_6
1/6 
start stop bwd fwd

Photovoltaic Park of Renault Factory in Flins, France

On this project, our staff has executed all the civil works including foundations, trenches for the passage of electrical cables and paving.

We also executed the renovation of a building in a control center, the protection of metals pillars and joints between the solar panels.

  • Location: Flins (France)
  • Construction company: Elecfrance (Grupo Elecnor)
  • Construction year: 2011
  • Executed items:

    30,000 m3 of concrete poured in foundation and trenches

    1180 u Foundations of metal pillars

    2600 ml. Trenches for the passage of electric cables

    85 u Manholes installed

    5000 m2 Asphalt