20131009_145500
20131031_112434
20131121_072933
33_NAD_3507-280320131200-Large
HO-ITER-SITE-aerial-Platform
1/5 
start stop bwd fwd

ITER - TB03/TB05/TB07

In this work Copuno performs the camp installation in the ITER project. We performed the foundations of the modular buildings, crosswalks, slabs of the storage areas, drainage networks, wastewater, potable water, electrical and telecommunications as well as the paving of roads and the perimetral fenced of the areas.


Location: Cadarache (Francia)
Construction companies: Dodin Campenon Bernard - Ferrovial - Razel-Bec
Year: 2013