- Construction company: UTE FCC-Comapa
- Construction year: 2003
- Work carried out by GRUPO COPUNO: Our staff has achieved the construction of the pumping room and the loading system by installing the main supply pipe of the Segarra-Garrigues canal. The station is equiped with 8 pumps and pipes of 3000 mm of diameter. Our staff also completed all the formworks and built the station enclosure.
- Location: Rialp (Lleida)
- Other relevant information:
– Structural concrete poured
– Concrete poured for the realization of cable channels
– Formwork of double-sided walls
– Formwork of single-sided walls
– Formwork of concrete manhole covers
– Installation of hydro-expansive joint
– Installation of DYWIDAG anchorages
– Laying and painting of PVC plates for walls waterproofing
– Renewal of reinforcement steel bars in the caisson area
– Welding
– Construction of 10 cm thick walls
– Walls face lifting
– Laying of terrazzo
– Erection and dismantling of scaffolding
– Laying of drainage pipes including the laying of geotextile and a layer of gravel
– Formwork for Howell-Bunger valve installation