C-12 Road of Ager–Cruella de Balaguer

The new C-12 road includes several viaducts for which achievement our staff participated. We also carried out works on electrical conduits, and sanitation works and others.

  • Location: Balaguer (Lleida)
  • Construction company: Copisa
  • Construction year: 2006
  • Execute items:

    1 928.69 m3 of concrete pouring and leveling in strip foundations

    6 160.00 m3 of concrete pouring and vibrating in backfillings

    8 162.00 m3 Pouring, vibrating and curing of concrete in foundations and strip foundations

    6 164.23 m3 Casting, vibrating and curing of concrete for walls

    7 213.50 m2 Formwork for foundations

    9 381.00 m2 Formwork of high walls (over 8 m high)