Bracons Tunnel

This work has required laborious six years of construction: viaducts, drainage and various tunnels were executed. One of the tunnels is the third longest tunnel in Catalonia, with 4.5 km.

  • Location: Vic (Girona)
  • Construction company: UTE FCC-Guinovart
  • Construction year: 2004
  • Execute items:

    303,188.28 m2 formwork of visible surfaces and pouring of concrete in walls

    Assembly works of a water treatment tank

    902.00 m2 Blinding concrete HM-15

    1820.00 m3 Concrete for foundations