Vielha Tunnel

 

Our staff participated in the construction of Vielha tunnel (also called Juan Carlos I Tunnel) of 5320 m long and with 3 traffic lanes.

  • Location: Vielha (Lleida)
  • Construction company: UTE OHL-Comsa-Copcisa
  • Construction year: 2002
  • Execute items:

    1400.00 ml. Drainage network with connections to gutters

    386.50 ml. Guttering layout and drains landfill

    252.00 m2 Execution of embankment slopes in the accesses area, including lay out of cross headings and broken bricks

    359.22 m2 Lay out of roughened coating on the walls of the car park accesses

    2592.71 ml. Completion of the underground network for the passage of medium voltage and communication cables

    220.00 ml. of gutters

    564.00 ml. Lay out of manholes (1x1x1m) for communication networks

    1483.96 ml. Dismantling of existing guardrail

    775.00 ml. underground network for lighting cables