Desalination plant in El Prat de Llobregat

On this project our staff has achieved, among others, the filters formworks, the pumping stations and the outfall.

  • Location: El Prat de Llobregat (Barcelona)
  • Construction company: Dragados - Drace - ATLL
  • Construction year: 2008
  • Execute items:

    5325.00 m2 Formwork of slabs and foundations

    57,556.00 m2 Formworks of walls

    22,154.00 m2 Formwork of slabs and beams

    8365.00 m3 of binding concrete poured

    16,919.50 m3 of concrete poured in slabs and beams

    22,545.00 m3 of concrete poured in walls

    9916.00 m3 of concrete poured in slabs and foundations