Pumping Station in Sant Boi de Llobregat
On this station, our staff carried out the manholes formworks, and masonry works relating to urban development.
- Location: Sant Boi de Llobregat (Barcelona)
- Construction company: Acsa Sorigué
- Construction year: 2008
- Execute items:
27317.12 ml. Pipe laying
599.40 ml. Laying and anchoring of New Jersey type safety barrier
75.20 ml. Trench leveling
2850.00 m2 formwork of manholes, walls and slabs
1800.00 m3 Pouring concrete in manholes, walls and slabs, including vibration and cure
10,500.00 m3 of soil compaction in trench
17418.47 m3 Backfillings used for the realization of the subgrade and the recovery of pipes