Irrigation system of South Garrigues

Our staff on this project has achieved:

- Pumping Station EB-3, next to the E-3 tank

- Filtering station at the exit of E-4 tank for the irrigation of the 600.2 area.

- Secondary distribution network for the irrigation of 600.2. area 

- Installation of hydrants in the 600.2 area for a total of 72 groups.

- Tertiary distribution network 600.2 corresponding to the zone.

  • Location: Les Garrigues (Lleida)
  • Construction company: UTE Dragados–Arnó
  • Construction year: 2007
  • Execute items:

    2,300 m2 Formwork of not visible surfaces

    1,500 m2 Formwork of visible surfaces

    4000 m3 Pouring concrete in foundations and walls