On this project, our staff has executed all the civil works including foundations and trenches for the passage of electric cables.

We also executed the protection of metallic pillars and the aplication of joints between the solar panels.

  • Location: Sandouville (Normandie, France)
  • Construction company: Elecfrance (Grupo Elecnor)
  • Construction year: 2011
  • Executed items:

    2.500 m3 of concrete poured in foundations and trenches

    1.300 u Foundations of metalic pillars

    1.600 ml. Trenches for the passage of electric cables

    100 u Manholes instaled