UTE HOCHTIEF – FCC – ACB

In this work our company realizes in Riga International Airport (Rīgas Starptautiskā Lidosta) the aircraft platform enlargement, the reconstruction of the track drains, sanitation system and electrical conduits without interrupting the daily airport operations.

 

  • Location: Riga (Latvia)
    Construction companies: HOCHTIEF - FCC – ACB
    Year of construction: 2013
    Executed items:
    27,000 m³ - Concrete pouring

    6,900 m² - Formwork
    600,000 m² - Surface finishing of concrete